We have one photovoltaic plant already in operation that will be complemented by the first concentrated solar power plant in Latin America (inside the same solar complex) and two other projects of the same kind on the table: Likana Solar, in Calama; and Pampa Unión, located in Sierra Gorda. All these projects have a common denominator: providing sustainable energy solutions 24/7 under the seal of being sustainable throughout the different phases of the project.
-
In 2020, the Cerro Dominador photovoltaic plant produced 304 GWh. The plant factor was 34.7% (world goal: 35%)
-
24/7 SOLAR REVOLUTION: Through this sustainability strategy, we have established commitments and goals to be a contribution to attaining carbon neutrality and to permanent sustainable development 24 hours a day, 7 days a week.
On the basis of a materiality study, we identified the following material topics that are also related to the pillars in our 24/7 Solar Revolution strategy. The topics are: