news

Roblería

21 July, 2022

Roblería

Run-of-river mini hydro power plant in operation since July 2013. This power plant uses the waters of an irrigation channel that delivers water to the irrigators’ community between September and May, where most of its production is concentrated. The water is used before being delivered to the irrigators, using its force to generate electricity with minimal impact on the environment.

Installed capacity: 4.0 MW

Location: Linares, VII Región

Related News