21 July, 2022
Run-of-river mini hydro power plant in operation since June 2017. Having a snow hydrological regime, with greater generation capacity during spring to summer months, this mini power plant uses the force of water to generate electricity, returning it entirely to its natural course generating minimal impact on the environment.
Installed capacity: 9.0 MW(1)
Location: San Fernando, VI Región